chipy
New Member
Hi again,
I posted about a week ago and had a rusted stack removed and replaced with PVC. Though i believe i was overcharged. Do you think there is 250$ worth of fittings (from the no hub at the top and the other at the left, one big tee shape, with a 2 inch going up to the kitchen)?
Also, they leaded/melted the pvc with lead to fill the joint. I've never seen this bonding technique and it doesn't seem like its smart. Edit: My reasoning: although it will initially produce a tight fit, there is nothing there when the pvc contracts/expands.
I posted about a week ago and had a rusted stack removed and replaced with PVC. Though i believe i was overcharged. Do you think there is 250$ worth of fittings (from the no hub at the top and the other at the left, one big tee shape, with a 2 inch going up to the kitchen)?
Also, they leaded/melted the pvc with lead to fill the joint. I've never seen this bonding technique and it doesn't seem like its smart. Edit: My reasoning: although it will initially produce a tight fit, there is nothing there when the pvc contracts/expands.
Attachments
Last edited: