ZE496
New Member
I have a kitchen drain pipe that has a split in it. I took some siding off the exterior so the plumbing would be easier to access.
As you can see, the pipe runs through a hole in a set of 4 studs. The split in the pipe is right at the elbow and down to almost where it enters the set of 4 studs. I can cut the pipe out. But given the pipe's length, I don't think I can fit a new length of pipe inbetween the 4 set studs and the next stud over. As you might also be able to see, there's a supply pipe on the elbow side of the stud set. I really don't want to notch the set of 4 studs and patch in a piece of wood after the pipe is replaced. I'm at a loss as to how to proceed. Any advice would be much appreciated!
As you can see, the pipe runs through a hole in a set of 4 studs. The split in the pipe is right at the elbow and down to almost where it enters the set of 4 studs. I can cut the pipe out. But given the pipe's length, I don't think I can fit a new length of pipe inbetween the 4 set studs and the next stud over. As you might also be able to see, there's a supply pipe on the elbow side of the stud set. I really don't want to notch the set of 4 studs and patch in a piece of wood after the pipe is replaced. I'm at a loss as to how to proceed. Any advice would be much appreciated!
Last edited by a moderator: