slowgsxr97
Member
Setting a fiberglass tub in the morning for my dad. I completely gutted his bathroom down to the original subfloor, 3/4" 1x8's. I installed 1/2" concrete board over the entire floor. In my alcove for the tub, it is level side to side. But I am a 1/2" out of level longways in 5 feet. This particular tub has several round supports on the bottom. It will be way to soft if I shim it like the directions say. It says mortar is optional but doesn't elaborate if thats to make the floor solid, or if I can use it to level the tub also.
Setting in the morning if I can. Can I use the mortar to level it, and how should I put it down? What mortar can I grab from menards? Any help would be appreciated.
On a side note, I installed this exact tub in my house 2 years ago. My floor was dead level both ways, and the tub still feels a little soft to me.
https://hw.menardc.com/main/items/m...5430-6030-6032-6632BathtubwithCodes6-2-17.pdf
Setting in the morning if I can. Can I use the mortar to level it, and how should I put it down? What mortar can I grab from menards? Any help would be appreciated.
On a side note, I installed this exact tub in my house 2 years ago. My floor was dead level both ways, and the tub still feels a little soft to me.
https://hw.menardc.com/main/items/m...5430-6030-6032-6632BathtubwithCodes6-2-17.pdf