Hello everyone. I have been lurking here and have learned quite a bit, thank you.
I am renovating our master bedroom, starting over from a gut job.
I will be plumbing in a new tub, shower, toilet and double vanity. I have read up on wet venting and would like to share my plan with you all to critique. It is hand drawn, so I apologize if I annoy some of you.
If you guys think this is a good plan and I can move with it, I do have one final hiccup/question that I'm embarrassed to admit and can't find anything on it. I am concerned with the maximum allowable distance from trap to vent. Am I measuring from outlet weir to the main 3" drain, or from outlet weir alllll the way to the actual dry vent at the double vanity? I am in trouble if it's the later.
Thank you everyone!
I am renovating our master bedroom, starting over from a gut job.
I will be plumbing in a new tub, shower, toilet and double vanity. I have read up on wet venting and would like to share my plan with you all to critique. It is hand drawn, so I apologize if I annoy some of you.
If you guys think this is a good plan and I can move with it, I do have one final hiccup/question that I'm embarrassed to admit and can't find anything on it. I am concerned with the maximum allowable distance from trap to vent. Am I measuring from outlet weir to the main 3" drain, or from outlet weir alllll the way to the actual dry vent at the double vanity? I am in trouble if it's the later.
Thank you everyone!