FatsoPilot
New Member
I paid a professional plumber to do the DWV rough-in for my basement. Does this look right? Should I be concerned about all the turns and possible future clogging with my toilet? It basically does a 360 to join back in to the old cast iron. If it is alright any idea on how I can get 4 more inches of clearance off the back wall (the wall with the main stack in it)? I don't see a way of doing it without throwing out $40 in parts, I can't cut in anywhere and put in a coupler and I can't get around the vent in front of it to bring it away from the wall. I was all ready to lay cement unit I measured and saw how far off the toilet drain is, so I dug it back up and now I'm having second thoughts on the whole layout. Thanks in advance for any advice/help.