The lead is poured and don’t venture to pour lead this early in your plumbing career or it might be your last.
Thanks Terry, I heartily agree with this sentiment.
1) cut pipe back where you can then use pvc and a pvc flange connecting the two with a fernco or no hub band whichever you prefer
number 1 is my go to route.
Yep agreed. That's what I ended up going with. Check the pics above.
Cheers!