I am plumbing a new bathroom and venting the toilet via wet vent. The Long 90 on the left is the vertical drop from the toilet. Then I had to jog it down to avoid HVAC on the other side of the block wall. The 2" wet vent is about 4'6" from the toilet drop. I am concerned that I should not have put the two 45s in before the vent. Will this work or do I need to break out the sawzall?
Thanks in advance.
JB[/ATTACH]
Thanks in advance.
JB[/ATTACH]