I anticipate the answer to this question is similar in most jurisdictions.
I have completed the underground drain lines for a 3 piece basement bath. It appears from local (Toronto) forums that my plumbing imspector will also expect to see the vent system complete however the stud walls through which the above grade plumbing will be installed can really only be built after the concrete is repaired. Any advice on what is normally expected? Also, I cant fimd a good desciption online of what may be expected by way of testing and/or how I should prep for that.
Thanks
John
I have completed the underground drain lines for a 3 piece basement bath. It appears from local (Toronto) forums that my plumbing imspector will also expect to see the vent system complete however the stud walls through which the above grade plumbing will be installed can really only be built after the concrete is repaired. Any advice on what is normally expected? Also, I cant fimd a good desciption online of what may be expected by way of testing and/or how I should prep for that.
Thanks
John