My question is about 3" ABS pipe
l've roughed in my toilet 12" from the finished drywall. l now want to install tiles and therefore need another 5/8". l have yet to secure the toilet flange to the sub floor and therefore can pull the flange 5/8 from the wall which in turn is bending the 3" pipe and connections running from the flange to the main stack about 4' away. So my question is will this stress on the glued ABS joints over time loosen and start to leak?
l've roughed in my toilet 12" from the finished drywall. l now want to install tiles and therefore need another 5/8". l have yet to secure the toilet flange to the sub floor and therefore can pull the flange 5/8 from the wall which in turn is bending the 3" pipe and connections running from the flange to the main stack about 4' away. So my question is will this stress on the glued ABS joints over time loosen and start to leak?