We are in the process of changing out the rooftop Condenser and ducted Air Handler for my Heat Pump system that was originally installed in 1997. The contractor(thru a warranty company) is changing the 3 ton Carrier unit to a Lennox unit. I believe the air handler was by First Company and they are attempting to replace with an upgraded First Company(possibly the same design). The challenge is that First Company has a 12 week lead time.
Is it possible to change out the Heat Pump now(with the new refrigerant) and then change out the Air Handler when available? We have been down for 8 weeks and another 12 weeks is going to be a problem.
Thanks in advance for any tips.
Best Regards, Dave
Is it possible to change out the Heat Pump now(with the new refrigerant) and then change out the Air Handler when available? We have been down for 8 weeks and another 12 weeks is going to be a problem.
Thanks in advance for any tips.
Best Regards, Dave