Drywall is in on about half the walls. Haven't started the shower/tub combo yet with Kerdi. Doing the walls first so I have the bottom plate to screw into. Then I can get my 2nd layer of plywood installed.
I screwed up on the box location for the vanity switch/gfi It's way too close to the 30" tall x 42" wide mirror. No biggie, I have plenty of access from the rear of the false wall since the hallway is still open.
I'm struggling a little now on deciding how high to install the subway tile and thus how high I should put the chair rail. If I do it anywhere near the mirror I'll have a weird situation to deal with since the chair rail sticks out so much.
I think the easiest thing to do is try to get it in between the top of the sink and the bottom of the mirror. I'll also have to contend with the window on the opposite wall.
Here's the height of the vanity on the 1st subfloor. It will sit higher because of 2nd subfloor (3/4") plus thinset + ditra (1/8") + thinset + 1/4" tile...so what is that about 1 1/2" - 1 3/4" higher than now.
Here you can see where the top of the sink will be. The sink itself is 2.5". The bottom of the mirror is 10" above that.
All measurements are to the 1st subfloor. Here's the main set of switches. Light, fan, then wall mounted heater.
There's the switch that's being hit by the mirror. Ugh.
Wall adjacent to vanity and switches.
Not happy with how the mirror stain came out (purchased like this). Will most likely sand and redo it.