hi, im in the middle of putting a sump pump and basin in,and i dug down the 24" deep.
my intentions are to hook up the weeping tiles to it. after about a day the hole is completely full of water, but not from the weeping tiles so i assume i have a high water table. my question is do i put the basin in the hole and backfill around the basin with 3/4" crushed stone, put the weeper drain into the one of the basin hole, and drill holes into the basin to take away the water that surrounds the basin? if so how high to drill and how many holes?
if i have to install this basin a different way i would appreciate anyone explaining the proper way to go about it thanks.
my intentions are to hook up the weeping tiles to it. after about a day the hole is completely full of water, but not from the weeping tiles so i assume i have a high water table. my question is do i put the basin in the hole and backfill around the basin with 3/4" crushed stone, put the weeper drain into the one of the basin hole, and drill holes into the basin to take away the water that surrounds the basin? if so how high to drill and how many holes?
if i have to install this basin a different way i would appreciate anyone explaining the proper way to go about it thanks.