BlueGoldfish
New Member
First time doing DWV work...
Adding a new washer stub out. Even though I only needed 2” sewer - I ran 3” underslab to this location incase I ever remodel and want a toilet here. I reduce to 2” coming out the slab and then it’s all 2” from there including vent. Of course right after I glued that ptrap I am second guessing if I should have done a 3” clean out at the slab before the reducer.
Wondering if
1. This would pass as-is with the 2” cleanout
2. It’s ok to rely on 2” opening to snake. This is the end of the 3” line.
Fwiw - my county is on UPC.
Adding a new washer stub out. Even though I only needed 2” sewer - I ran 3” underslab to this location incase I ever remodel and want a toilet here. I reduce to 2” coming out the slab and then it’s all 2” from there including vent. Of course right after I glued that ptrap I am second guessing if I should have done a 3” clean out at the slab before the reducer.
Wondering if
1. This would pass as-is with the 2” cleanout
2. It’s ok to rely on 2” opening to snake. This is the end of the 3” line.
Fwiw - my county is on UPC.