Lakee911
I&C Engineer (mostly WWTP)
Hey All,
I thought that I would share some pictures of my sewer repair in progress. These couple of fellas hand dug the 7feet down to the pipe where I have an offset joint that is causing problems.
http://i159.photobucket.com/albums/t131/lakee911/P2270017.jpg
http://i159.photobucket.com/albums/t131/lakee911/P2270018.jpg
http://i159.photobucket.com/albums/t131/lakee911/P2270021.jpg
They think they'll have to dig back on the pipe and raise it up, or maybe use an 11 degree angle. Personally I think they should cut the cast back 6 or 8" on either side and use PVC between the two with a couple of Ferncos or No- Hubs. I know it's tough to see what's going on down there.
I'm going to talk to them again in the morning.
Jason
I thought that I would share some pictures of my sewer repair in progress. These couple of fellas hand dug the 7feet down to the pipe where I have an offset joint that is causing problems.
http://i159.photobucket.com/albums/t131/lakee911/P2270017.jpg
http://i159.photobucket.com/albums/t131/lakee911/P2270018.jpg
http://i159.photobucket.com/albums/t131/lakee911/P2270021.jpg
They think they'll have to dig back on the pipe and raise it up, or maybe use an 11 degree angle. Personally I think they should cut the cast back 6 or 8" on either side and use PVC between the two with a couple of Ferncos or No- Hubs. I know it's tough to see what's going on down there.
I'm going to talk to them again in the morning.
Jason