r_ventura_23
Member
I am running a 3" soil stack from the second floor to the crawl space. I would like it to run straight down and then at some point before it gets to the crawl space i need it to reroute. Will the code allow me to do this? I would like to use two 45's to give me a few extra inches in one direction and then continue it straight down.
Thanks in advance.
Thanks in advance.