Matt Crawford
New Member
Hey all. First time poster here. I'm gutting an old bathroom and moving fixtures around, thereby moving all piping and vents. I've created a drawing of what I want to do, but want to run it by the experts here before finalizing. In the picture attached, the 4" waste line is the only existing pipe. 2" vents will be connected in the attic and penetrate roof with 3".