Lrivers
New Member
I am doing my first bath remodel. I have demo'd the bath to the studs and set the bathtub. We are going to tile above the tub for the shower. Now I am at the point of hanging the cement board. Without actually hanging the board, what I see in my minds eye is a gap between the back of the tile and the tub lip. The tub is attached to the stud, and the 1/2" board is attached to the stud. The lip of the tub is not close to half an inch so there is going to be a gap, I think. Here is what I think is going to occur:
What do I do to fill that gap or am I just wrong in my thinking?
What do I do to fill that gap or am I just wrong in my thinking?