Gtomike06
New Member
I had been waiting on a plumber for 2 months to rrplace the old galvanized pipe so the siding guys could get started on my house. I took off work last week and put the CPVC in the exterior walls with the siding removed. I used the Oatey all purpose cement in the red can since I was going to be messing with some PVC on the outside of the house as well.
Now that Im done and the siding guys have started closing up the walls I was reading around on the forum and saw alot of guys saying the all purpose is a big no no..... it's to late for me to remove the walls and have it all took out and I'd have to go in from the inside walls now how often does the all purpose fail? It's been over a week and I check every connection I can get to daily and everything seems to be holding fine.
Thanks.
Now that Im done and the siding guys have started closing up the walls I was reading around on the forum and saw alot of guys saying the all purpose is a big no no..... it's to late for me to remove the walls and have it all took out and I'd have to go in from the inside walls now how often does the all purpose fail? It's been over a week and I check every connection I can get to daily and everything seems to be holding fine.
Thanks.
Last edited by a moderator: