Hello forum. I'm looking for feedback on my setup. Like the title says this is my 1st shot at putting a boiler setup together. The 2 upper manifolds are in floor 300ft loops 1/2 and the bottom is higher temp baseboards. Any glaring problems stand out? Thanks for looking.