Hi,
I'm adding a bath in the basement and will trench concrete floor. Once that is done I have a question about the shower basin drain to the main drain line in the bath group.
In order to keep distances shorter, after the P trap from the shower I would need to make a 150 degree turn into the main line into a 3x3x2" wye.
The longer route would be go a bit further, make a 90deg turn, then a 60deg turn into the wtye.
My question is what is the max angle I can make from the horiz shower drain into the main wye? I live in Arvada Colorado.
Rough Sketch (The ... are just to keep alignment of the graph)
^
| <---- Main bath group 3" line
|........o <---- Shower end of Ptrap
|......./
|...../
|\---/ <---- This angle would be 150deg into the wye
|
|
The alternative is:
^
|
|.............o
|..............|
|..............|
|\------------ 90deg, 60deg at main line
|
|
Thanks,
-Bruce
I'm adding a bath in the basement and will trench concrete floor. Once that is done I have a question about the shower basin drain to the main drain line in the bath group.
In order to keep distances shorter, after the P trap from the shower I would need to make a 150 degree turn into the main line into a 3x3x2" wye.
The longer route would be go a bit further, make a 90deg turn, then a 60deg turn into the wtye.
My question is what is the max angle I can make from the horiz shower drain into the main wye? I live in Arvada Colorado.
Rough Sketch (The ... are just to keep alignment of the graph)
^
| <---- Main bath group 3" line
|........o <---- Shower end of Ptrap
|......./
|...../
|\---/ <---- This angle would be 150deg into the wye
|
|
The alternative is:
^
|
|.............o
|..............|
|..............|
|\------------ 90deg, 60deg at main line
|
|
Thanks,
-Bruce