I've attached the driller's report.
My question is about the casing--why would there be the 2" slotted pipe from 555' - 565', if the 4-1/2" casing goes all the way to 605'?
Also, with the available information, is there a way to tell what the original static water level was?
Thanks
Edit: Also, it shows gravel pack from 534' to 670'; yet it shows cemented from 0' to 604'. How does that work?
My question is about the casing--why would there be the 2" slotted pipe from 555' - 565', if the 4-1/2" casing goes all the way to 605'?
Also, with the available information, is there a way to tell what the original static water level was?
Thanks
Edit: Also, it shows gravel pack from 534' to 670'; yet it shows cemented from 0' to 604'. How does that work?