Bradley Grillo
New Member
Hi first time caller long time listener - I'm renovating a house and moving everything around. Before I start roughing in I wanted to see if I made any mistakes according to the 2015 IRC. I have attached the drawings (all pipe is PVC 2" and 3")
The specific questions I have are:
- I need (2) 1/8 bends to change direction in the 2" vent above the kitchen sink because the wall is sloped. Does it need to be at least 6" above the sink?
- I have 3 cleanouts as shown. There is less than 40' between them. My last cleanout is 20' from the foundation wall. After the pipe goes through the foundation wall, there is 12' until it dumps into the septic tank. Do I need a cleanout outside or is the septic tank close enough?
The specific questions I have are:
- I need (2) 1/8 bends to change direction in the 2" vent above the kitchen sink because the wall is sloped. Does it need to be at least 6" above the sink?
- I have 3 cleanouts as shown. There is less than 40' between them. My last cleanout is 20' from the foundation wall. After the pipe goes through the foundation wall, there is 12' until it dumps into the septic tank. Do I need a cleanout outside or is the septic tank close enough?