rnjohnston61
New Member
- Messages
- 1
- Reaction score
- 0
- Points
- 0
Hi all. I've got an older(30 yr), 26" bored well that I need to get the sabd out of the bottom. The static water level is 52'. The well is inside a block building so the only way to clean it out with a cable bailer is to take half the roof off.
My question is: Can someone tell me how to make a bailer bucket that I could use with a rope and pulley?
I know it involves alot of up and downs with the bucket, but I've got to do something....
All help is appreceated.:
My question is: Can someone tell me how to make a bailer bucket that I could use with a rope and pulley?
I know it involves alot of up and downs with the bucket, but I've got to do something....
All help is appreceated.: