dwilson
New Member
Hi everyone,
I'm trying to decide where to put a sewage cleanout at the exterior of a house (my house). The tricky thing is there's a 90 degree turn around 10 feet from where the pipe (4" PVC) exits the slab. Beyond the 90 degree there's another cleanout around 30 feet away.
As I see it, there are three options
1. Cleanout before (upstream) turn, optionally 2-way.
2. Cleanout at turn.
3. Cleanout after turn.
I think that all three are allowed by code. 2-way is nice, but also would be nice to have a clear shot at that 30' stretch beyond the turn.
Any recommendations?
Picture below. Thanks for any advice.
Dal
I'm trying to decide where to put a sewage cleanout at the exterior of a house (my house). The tricky thing is there's a 90 degree turn around 10 feet from where the pipe (4" PVC) exits the slab. Beyond the 90 degree there's another cleanout around 30 feet away.
As I see it, there are three options
1. Cleanout before (upstream) turn, optionally 2-way.
2. Cleanout at turn.
3. Cleanout after turn.
I think that all three are allowed by code. 2-way is nice, but also would be nice to have a clear shot at that 30' stretch beyond the turn.
Any recommendations?
Picture below. Thanks for any advice.
Dal