Hello,
I located a toilet flange in my basement this past week and I am wanting to install a half bath now. My issue is that the waste stack sits really close to the flange. It seems like I will need to angle it the opposite way with PVC and mission couplings, add a cleanout and then angle it back in. If I measure the current stack from left to right I am getting a measurement of 3.5". After searching this issue online I do see it comes up but there is no real clear solution to reduce the pipe to 3" pvc or increase it to 4" pvc. Any ideas?
I located a toilet flange in my basement this past week and I am wanting to install a half bath now. My issue is that the waste stack sits really close to the flange. It seems like I will need to angle it the opposite way with PVC and mission couplings, add a cleanout and then angle it back in. If I measure the current stack from left to right I am getting a measurement of 3.5". After searching this issue online I do see it comes up but there is no real clear solution to reduce the pipe to 3" pvc or increase it to 4" pvc. Any ideas?