Hey guys,
I'm running some PEX to replace some galvanized pipe in my bathroom. I have a house built using post and beam construction. How do you run PEX perpendicular to the beams? If you are supposed to support it every 32" and the beams are 4' apart?
How far apart is it OK to run PEX side by side? (Hot/cold)
Thanks
I'm running some PEX to replace some galvanized pipe in my bathroom. I have a house built using post and beam construction. How do you run PEX perpendicular to the beams? If you are supposed to support it every 32" and the beams are 4' apart?
How far apart is it OK to run PEX side by side? (Hot/cold)
Thanks