I am doing a complete bath remodel and converting a tub to a tiled shower. I understand this requires a 2" drain instead of the 1.5" that was already there. I'm also a fan of things that don't clog up as often.
My problem is that the 1.5" line enters the top of the soil pipe (in basement with full access) into a 1.5" fitting. I would prefer not to cut into the cast iron stack.
There is a 3" cleanout in the floor directly next to the soil pipe.
Is there a problem using this cleanout for the drain? I figured I would thread in a 3" pvc adapter, attach a 3"-2" sanitary wye, a new cleanout on top, and vertical 2" pipe to near the ceiling. The horizontal run would be about 12' from the shower drain trap with a single 45 degree bend along the way.
Thanks for any advice.
My problem is that the 1.5" line enters the top of the soil pipe (in basement with full access) into a 1.5" fitting. I would prefer not to cut into the cast iron stack.
There is a 3" cleanout in the floor directly next to the soil pipe.
Is there a problem using this cleanout for the drain? I figured I would thread in a 3" pvc adapter, attach a 3"-2" sanitary wye, a new cleanout on top, and vertical 2" pipe to near the ceiling. The horizontal run would be about 12' from the shower drain trap with a single 45 degree bend along the way.
Thanks for any advice.