I'm putting new flooring in a toliet room and must raise the flooring a bit to match the existing flooring where the shower is. So must add 3/4 inch plywood and then wonderboard and then the tile or tavertine. Could be close to a 2 inch raise.
My question is: with this increase in floor height above the current condition with the vinal floor that is coming up; how will the flange work- if it is recessed? is there an adapter I can buy to raise the height of the current toilet floor drain flange? I'm a bit worried about loosening the flange in it's current location (no access from below) to slip more Plywood underneath.
Please Advise
Thank You!!
Great web site, thanks again for all your help
My question is: with this increase in floor height above the current condition with the vinal floor that is coming up; how will the flange work- if it is recessed? is there an adapter I can buy to raise the height of the current toilet floor drain flange? I'm a bit worried about loosening the flange in it's current location (no access from below) to slip more Plywood underneath.
Please Advise
Thank You!!
Great web site, thanks again for all your help