valkyrie_grrl
New Member
- Messages
- 3
- Reaction score
- 0
- Points
- 0
I am in the process of remodelling my bathroom.
I have decided to use ceramic tile for the shower/tub surround. I have removed all the previous worn/mismatched tiles. Will I need to remove all the old drywall down to the studs before putting new greenboard/backerboard up or can I just put the new material over the old stuff?
Thanks...
Angie
I have decided to use ceramic tile for the shower/tub surround. I have removed all the previous worn/mismatched tiles. Will I need to remove all the old drywall down to the studs before putting new greenboard/backerboard up or can I just put the new material over the old stuff?
Thanks...
Angie