House was built in 1972. We are remodeling our small master bath (7.5' x 5.5'). I ordered a 36" x 36" tile redi shower pan and looking straight down the drain, there is a 3" ABS drain pipe coming from the toilet next wall over from the other bathroom. Im trying to figure out if theres a way of making this work whether that's coming off the 3" pipe or and I'm not sure if this is allowed moving the 3" pipe over just enough that i could use another drain line from the old vanity or original drain which both are 1-1/2". Any suggestions on how I can make this work? Thank you Pics