Hi There,

My wife and I are redoing our upstairs bathroom due to several mistakes made by the prior owners. The most major of which was cutting two floor joists in half in order to perform a plumbing repair:
DSCN0902.JPG
!

Here's a horrible drawing of the bathroom layout and the plumbing the way that it was:
plumbing.png


Pink = Fixtures, with the toilet being in the far corner
Blue = joists
Red = existing drain lines
Green = cut joists

So the 5 million dollar question is how does one get the drain pipe from the tub end of the bathroom to the toilet drain?

Thanks so much,
Gil
Sistering joists in steamy CT
 

gilmil

New Member
Messages
16
Reaction score
0
Points
0
Location
ct
After reading some posts I'm going to work on a 3D diagram of this and post it sometime soon.
 

Jastori

Member
Messages
122
Reaction score
0
Points
16
Location
Illinois
edit: Ooops... I think I misread... if you need to pass a 3" drain line through the joists, it is significantly more difficult, but may be still possible. It is certainly preferable to avoid having a 3" or 4" drain pass through joists.

----

You should be able to drill holes for the tub drain to pass through the floor joists without causing structural problems. The common code requirement for drilling holes is to stay 2" away from top and bottom of joist, with max. hole diameter less than 1/3rd joist height (note: notching guidelines are significantly more restrictive). For a 2x10 or 2x12 floor joist, you should be able to safely drill for a 1.5" or 2" drain line to run the tub drain line through the joists.

The link below has code requirements for notching and drilling studs. I think their diagram is consistent with 2003 IRC.
http://www.ci.bloomington.mn.us/handouts/53/53znotch.pdf
 
Last edited:

Jadnashua

Retired Defense Industry Engineer xxx
Messages
32,771
Reaction score
1,191
Points
113
Location
New England
There is a potentially significant additional criteria about when and where you can drill holes in the joists...they can't be within x of the ends of the span (don't remember the x). In the middle of the span, the majority of the strength in stiffness is from the top expanding, and the bottom compressing, but at the wall edges, you need to account for the point loads of the walls, so holes there are more of a problem (and for probably other reasons, I've forgotten!).
 

hj

Master Plumber
Messages
33,599
Reaction score
1,037
Points
113
Location
Cave Creek, Arizona
Website
www.terrylove.com
My first requirement would be to physically see the house and the installation. There are things not shown in the picture or the drawing which might impact how to do it, such as which end has the tub drain, and why? One indication that it was NOT a plumber who did it is the use of a bushing to connect the drain to the closet bend fitting.
 
Last edited:

gilmil

New Member
Messages
16
Reaction score
0
Points
0
Location
ct
The layout was the original to the house, or at least was galvanized drain pipe and some brass water pipes. The drain for the tub is at that end because there is a window on the other end of the tub. We decided to keep the layout the same, but it was brought up to code.
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks