Jeff H Young
In the Trades
if the vent goes straight up and out roof. you can put band at the bottom of stack with visqueen inside to stop water from draining out for test . aftyer test take a piece of half inch copper or whatever 10 foot long on roof and poke hole in plastic to drain. that solves test but you still got a cleanout issue what about pointing cleanout away from bathroom?