I am relocating a second-floor bathroom. The main problem I am dealing with in planning out the remodel is figuring out the drain to the existing stack. I cannot run straight to the stack. I have U-shaped stairs in the space the drain would typically go through to get to the stack. Going around the stairs is not feasible. I'm looking for advice on the solution I am thinking about, which I have illustrated.

I want to run the drain horizontal under the bathroom floor, then vertical down the wall, then horizontal again under the first stairway landing. Under the stairs is just closet space. Below the first floor there is an unfinished basement, but I do not think I could get the necessary pitch in the run to the waste pipe due to the height of the waste pipe as it exits the wall.

Vents can be run through the attic space to the existing vent stack, or I can introduce a new vent through the roof. I am just focusing on the drain first.

Any advice? I figure it would be okay with gradual transitions, and cleanouts for each horizontal section?
 

Attachments

  • nhWx8RaQRI.png
    nhWx8RaQRI.png
    21.2 KB · Views: 187

Reach4

Well-Known Member
Messages
38,896
Reaction score
4,436
Points
113
Location
IL
I want to run the drain horizontal under the bathroom floor, then vertical down the wall, then horizontal again under the first stairway landing. Under the stairs is just closet space. Below the first floor there is an unfinished basement, but I do not think I could get the necessary pitch in the run to the waste pipe due to the height of the waste pipe as it exits the wall.
Just checking-- you do understand that the pitch of 1/4 inch/ft becomes a minimum after the vent, right? After the trap arm has been vented, the pipe can go steep.
 

iamayak

New Member
Messages
3
Reaction score
0
Points
1
Location
52001
Just checking-- you do understand that the pitch of 1/4 inch/ft becomes a minimum after the vent, right? After the trap arm has been vented, the pipe can go steep.
Yes! I really oversimplified and did not explain that.
Given minimum pitch in all sections, then, the drop should not cause a problem? I've just never seen a diagram with this sort of layout used. It seems people always have access to do a much more direct route to the stack.
 

Reach4

Well-Known Member
Messages
38,896
Reaction score
4,436
Points
113
Location
IL
I am not a plumber. With enough cleanouts, you should be able to do what you propose.

I am thinking a U-shaped stairs is similar to a spiral staircase, but just a smaller arc.
 

iamayak

New Member
Messages
3
Reaction score
0
Points
1
Location
52001
T
I am not a plumber. With enough cleanouts, you should be able to do what you propose.

I am thinking a U-shaped stairs is similar to a spiral staircase, but just a smaller arc.
Thanks for your replies.
The stairway is in a wide "U"; 3 straight sections, 2 landings, with most of the steps between the landings. My rough diagram with the initial post shows the 2 landings and the stairs between, though in reality there are more steps. If this plan comes together, the stair layout works to my advantage by allowing me to run the drain under that lower landing.
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks