I am putting a new bathroom in. I have jackhammed the concrete out to expose the 4" PVC main line. I can get at about 18-20" of it.
I need to add a "T" in this line. There is no movement in the line so when I cut it how do I get a "T" into it.
I need to add a "T" in this line. There is no movement in the line so when I cut it how do I get a "T" into it.