How does one open up a cast iron soil pipe clean-out that has lead joints?
Also, if I can get rid of some of the cast iron, like below the floor, is there something like straps that I can use to support the remaining stack above the floor and thru the roof?
PSlinger
Also, if I can get rid of some of the cast iron, like below the floor, is there something like straps that I can use to support the remaining stack above the floor and thru the roof?
PSlinger