Hello,
This is my first plumbing project so I would like any advise or feedback. I have everything roughed in and before I glue the pipes and fill in the area, I would like to make sure I have everything in order because there will be no going back.
I had to re-route the toilet, and add the sink drain. I added a 4" clean out behind the sink that will be in storage (unfinished) area. I tied the sink vent into the existing vent.
Thanks for the help
This is my first plumbing project so I would like any advise or feedback. I have everything roughed in and before I glue the pipes and fill in the area, I would like to make sure I have everything in order because there will be no going back.
I had to re-route the toilet, and add the sink drain. I added a 4" clean out behind the sink that will be in storage (unfinished) area. I tied the sink vent into the existing vent.
Thanks for the help