agentfitz
New Member
Hey guys, I'm pretty new to this. One of the challenges of this design is that the toilet flanges sit directly above the main drain and therefore are dropping straight down into it (with a long sweep 90)... not going horizontal first.
With that in mind, does it look like I am venting the system properly?
I am open to any other insights or suggestions. Thank you for taking a look
*NOTE*: here is a higher resolution version of the diagram:
With that in mind, does it look like I am venting the system properly?
I am open to any other insights or suggestions. Thank you for taking a look
*NOTE*: here is a higher resolution version of the diagram:
New item by Brian FitzGerald
photos.app.goo.gl