Bob Cooper
New Member
I'd like some advise on how to make this connection and i also realize that I may need to undo what I've done. Platform tub on slab. 2" roughed in drain line. I went ahead and connected the overflow and drain as a unit...to the tub but it's unclear to me (a) if the order is right...should I have not done this yet and (b) how to make this connection. I'm sure I'm going to need to raise the platform some -- what you see right now is the tub sitting flush on the deck before durock/tile so without me raising the deck the unit will rise about 3/4" but I think I'll need to add another 1.5" to have some working room.
I figured I'd use a 2" street 90 and then ??maybe?? some flexible 1.5" PVC to connect this but advice sure is welcome.