Renovating a basement,removed a half bath, adding a 3/4 bath +bar sink.From the picture attached:
top left is lav, will be vented to roof(2")
toilet is next off 3way wye
next is shower 2"
bottom of picture is floor drain in utlity room then 2" pipe continues to bar sink which will also be vented through roof.
I have the two wyes laying there as possible vents, my thought was to have the shower vent "wet vent" the floor drain and the toilet,or do I need the toilet vented as well?
top left is lav, will be vented to roof(2")
toilet is next off 3way wye
next is shower 2"
bottom of picture is floor drain in utlity room then 2" pipe continues to bar sink which will also be vented through roof.
I have the two wyes laying there as possible vents, my thought was to have the shower vent "wet vent" the floor drain and the toilet,or do I need the toilet vented as well?