I'm a GC working on renovating an old restaurant into a new restaurant.
Plumbers came in and saw cut the slab to run their new sewer lines. Just below the slab in one area was a bunch of electrical conduits feeding parts of the building and some exterior lamp posts and signs.
Some of the conduit was just below the slab and some of it was 2" below the slab. The plumber's saw cutters cut through the conduits and wires inside and the electrician is saying its going to be an expensive fix because he has to pull all new wires.
What do you guys think?