We just finished our plumbing and prepared for inspection when I realized that our contractor who installed the septic connected the house drain to the system last week. He didn't say anything and we didn't observed until now. I called him and he said that he heard from my neighbor that already I passed the plumbing inspection and told his boy to connected the drain.
How I can pressurize or fill up the system for inspection with the main house drain connected to the septic? Is that mandatory to be done at inspection or is at the inspector mercy? Any advice is appreciated.
Thanks.