apparentgenius
New Member
Hi,
I'm currently plumbing my 2 story home under construction. I plumbed all of the 1st level and passed the under floor rough in. I am now completing the second floor and am almost ready for my final rough in inspection. My inspector wants me to fill the entire DWV system with water for the test
My question is, once I have installed the tubs, how do I block the first level tub from overfilling so that I can fill to the second floor? I have 2" balloons, but I don't know how I would use them on the tubs with the drains installed.
Any help is appreciated.
Thanks,
glen
I'm currently plumbing my 2 story home under construction. I plumbed all of the 1st level and passed the under floor rough in. I am now completing the second floor and am almost ready for my final rough in inspection. My inspector wants me to fill the entire DWV system with water for the test
My question is, once I have installed the tubs, how do I block the first level tub from overfilling so that I can fill to the second floor? I have 2" balloons, but I don't know how I would use them on the tubs with the drains installed.
Any help is appreciated.
Thanks,
glen