I,m remodeling my first floor bathroom, I want to remove a 4'' cast iron pipe and replace it with pvc and reduce the size if I could. This is from the bathroom floor up to the roof, there's no other connection on the pipe..The only fixtures I have are sink, shower and toilet...that are connected in the basement..attached is somewhat of my existing DWV design....