Polyethylene Pipe - Anodeless Riser to Schedule 40 Black Steel Transition

Users who are viewing this thread

PlumbPlumb

New Member
Messages
11
Reaction score
0
Points
1
Location
Florida
Hello all,

I have decided to use Polyethylene for propane gas, run underground in grass area before going up on the exterior wall and transitioning to Schedule 40 black Steel pipe and penetrate into building. I'm going up with an anodeless polyethylene riser to get above ground. How do you transition from the polyethylene riser to Sch 40 black steel pipe before penetrating the exterior wall? Trying to meet Florida Code.

Will an anode be required when going above ground?
 

Breplum

Licensed plumbing contractor
Messages
2,585
Reaction score
1,107
Points
113
Location
San Francisco Bay Area
You should have a certified installer who has been trained to install polyethylene gas.
UPC only allows black steel indoors, and requires glav. pipe outdoors. The anodeless riser is threaded.
Hire licensed plumber.
 
Top