Jesse Frantz
New Member
As of now, I’ve run my 1” main, 3/4” to/from water heater, and all 5 of my 3/4” cold supplies (4 hose bibs with full port 3/4” valves and 1 future expansion that will be capped off for now). Tomorrow I’ll get started on my other fixtures, all of which will be 1/2”. My goal is to have no fittings whatsoever between each manifold valve and it’s respective fixture. Additionally, I tried to design this manifold for maximum flow, and went with home run for the same reason. I figured if I’m doing all this work, might as well do it overkill!
Edit: I can’t seem to get my pictures to post, but I’ll try a different host.
Last edited: