naimc
New Member
Continuing on my washroom reno, from previous thread : https://terrylove.com/forums/index....-sink-tie-in-to-show-drain.107247/post-763794
At the point where the 2" drain meets the vent in 1-1/2" I used a Wye for the sink drain. I was distracted by vent routing and fail on this basic joint.
Now thinking of the sheet rock that will go up I realize that I should have use a 90 degree Tee correct ? as the wye would not allow proper venting because of the 45 degree angle ?
Part I should use ?
At the point where the 2" drain meets the vent in 1-1/2" I used a Wye for the sink drain. I was distracted by vent routing and fail on this basic joint.
Now thinking of the sheet rock that will go up I realize that I should have use a 90 degree Tee correct ? as the wye would not allow proper venting because of the 45 degree angle ?
Part I should use ?
