Hi. Couldn't see any discussion of wet venting that fit my specific situation.
Plumbing in a new bathroom and working around 2x8 joists in a basement with a low ceiling.
The line starts with the bathtub upstream, 2" P trap. That has a 2" vent. Then I have a vertical drop of about 10" into a 3" wye. The toilet then joins the 3" line with a 3" wye. The lav is downstream but has its own dry vent.
Here's the state of things (dry fitted). The red is the WC. There will be 4x3 elbow that will attach to the line in a missing 3" wye (the red circle). (Forgive the drawing skills...)
In the drawing below, the green section is what I believe is the horizontal wet vent. Is it to code? I suspect maybe the vertical drop might complicate it but I'm unsure. I have the bathtub section higher for better ceiling clearance.
I'm in Quebec, Canada.
Many thanks.
Shaun
Plumbing in a new bathroom and working around 2x8 joists in a basement with a low ceiling.
The line starts with the bathtub upstream, 2" P trap. That has a 2" vent. Then I have a vertical drop of about 10" into a 3" wye. The toilet then joins the 3" line with a 3" wye. The lav is downstream but has its own dry vent.
Here's the state of things (dry fitted). The red is the WC. There will be 4x3 elbow that will attach to the line in a missing 3" wye (the red circle). (Forgive the drawing skills...)
In the drawing below, the green section is what I believe is the horizontal wet vent. Is it to code? I suspect maybe the vertical drop might complicate it but I'm unsure. I have the bathtub section higher for better ceiling clearance.
I'm in Quebec, Canada.
Many thanks.
Shaun