JShine007
New Member
I am trying to solve for this.
1. I have a Geberit 2x6 installation that needs to tie in to a 3" horizontal sewage line. It can not go straight down in to the soil line. It needs to travel about 16 inches across and then hit the horizontal sewage line with a T of some sort. It is my understanding that the 3" that comes from the carrier can be set at a 45. Here is what I came up with for a solution. (see pic). I am going around about way because there is not enough room for the long run Tee Y-which I believe is what i need to T off horizontally.
2. I want to tie in to this horizontal line (3") that then goes vertical into the 4" main line. (see pic)
Thanks for any help with this!!
Will this work? In San Diego, CA
1. I have a Geberit 2x6 installation that needs to tie in to a 3" horizontal sewage line. It can not go straight down in to the soil line. It needs to travel about 16 inches across and then hit the horizontal sewage line with a T of some sort. It is my understanding that the 3" that comes from the carrier can be set at a 45. Here is what I came up with for a solution. (see pic). I am going around about way because there is not enough room for the long run Tee Y-which I believe is what i need to T off horizontally.
2. I want to tie in to this horizontal line (3") that then goes vertical into the 4" main line. (see pic)
Thanks for any help with this!!
Will this work? In San Diego, CA