DWV routing question

Users who are viewing this thread

Cobalt

New Member
Messages
12
Reaction score
0
Points
1
Location
Montreal
Hi,

First time posting.

I am renovating an older building and want to correct some plumbing in the process.

1. The 3" stack vent was reduced to 2" above the last fixture at "B" then upsized back to 3" at "C" before it exits the roof. I assume I need to replace that section of 2" with 3" to make it 3" continuous. (The building drain is 4". There is another separate 2" waste stack and a 3" roof drain. Or is this sufficient venting?)
see Diagram D



2. I need to offset the main stack from A to B as I can't go straight up vertically because of door. Which of 3 offset methods is the best. (see diagrams)

2 x 45° offset - Diagram A
Wye - Diagram B
Tee - Diagram C

Thanks for your comments.
 

Attachments

  • diagram A.jpg
    diagram A.jpg
    109.9 KB · Views: 209
  • diagram B.jpg
    diagram B.jpg
    106.5 KB · Views: 204
  • diagram C.jpg
    diagram C.jpg
    98.6 KB · Views: 211
  • diagram D.jpg
    diagram D.jpg
    40.2 KB · Views: 205
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks