dry stack retaining wall in process

Users who are viewing this thread

lmei007

Member
Messages
183
Reaction score
0
Points
16
Location
Maryland
I am building a 2.5' height (in total, 6" of the 2.5' will be burried, so only about 2' are above the ground), 75 feet long, 1 foot thick dry stack retaining wall now.

I have done the footing and first course. The base and the first course are about 18" width. The base is about 4" crushed stone.

please have a look to see is there anything is not good enough? do I have to fill in those holes with crushed stone after the first course?

thanks,
 

Attachments

  • IMG_3297.jpg
    IMG_3297.jpg
    50.1 KB · Views: 3,768
  • IMG_3300.jpg
    IMG_3300.jpg
    46 KB · Views: 1,486
  • IMG_3301.jpg
    IMG_3301.jpg
    44.6 KB · Views: 1,518
  • IMG_3136.jpg
    IMG_3136.jpg
    63.3 KB · Views: 2,250

lmei007

Member
Messages
183
Reaction score
0
Points
16
Location
Maryland
Another question is:
if I want to keep adjacent stone level for next course to do 1 over 2 and then 2 over 1, I found it will make me build a relatively levelled course. Then I have to use the same or similar thickness stones. My wall is about 73' long. I am worry it will be hard to find similar thickness stone later. Should I always keep adjacent stone level? I know I can use very thick stone to change to a new thickness level but the final result is the same, I think.
 
Last edited by a moderator:

lmei007

Member
Messages
183
Reaction score
0
Points
16
Location
Maryland
done few weeks ago;
 

Attachments

  • IMG_4167.jpg
    IMG_4167.jpg
    55.3 KB · Views: 1,293
  • IMG_4168.jpg
    IMG_4168.jpg
    73 KB · Views: 1,333
  • IMG_4169.jpg
    IMG_4169.jpg
    64.6 KB · Views: 1,313
  • IMG_4174.jpg
    IMG_4174.jpg
    31.7 KB · Views: 1,308
  • IMG_4176.jpg
    IMG_4176.jpg
    30 KB · Views: 1,241

lmei007

Member
Messages
183
Reaction score
0
Points
16
Location
Maryland
two more. We like it!!!!!!!!!!!111
 

Attachments

  • IMG_4178.jpg
    IMG_4178.jpg
    45.1 KB · Views: 1,307
  • IMG_4179.jpg
    IMG_4179.jpg
    69.2 KB · Views: 1,412

osx-addict

Software Engineer
Messages
38
Reaction score
0
Points
0
Location
Los Angeles
Yikes! That looks like a LOT of manual labor!! Looks great though! If I was reading correctly, you used no adhesive to hold things in place? Just curious..
 
Top